GIS user technology news

News, Business, AI, Technology, IOS, Android, Google, Mobile, GIS, Crypto Currency, Economics

  • Advertising & Sponsored Posts
    • Advertising & Sponsored Posts
    • Submit Press
  • PRESS
    • Submit PR
    • Top Press
    • Business
    • Software
    • Hardware
    • UAV News
    • Mobile Technology
  • FEATURES
    • Around the Web
    • Social Media Features
    • EXPERTS & Guests
    • Tips
    • Infographics
  • Blog
  • Events
  • Shop
  • Tradepubs
  • CAREERS
You are here: Home / Articles from Spatial Media Authors / Feature – Scan Twice—Cut Once: Accelerating Project Completion (Within Budget) Using LIDAR

Feature – Scan Twice—Cut Once: Accelerating Project Completion (Within Budget) Using LIDAR

August 13, 2013 By Editor

No matter how carefully work is planned, sometimes designs don’t easily translate into reality. Often, the more sophisticated the design, the more difficult it is to render into actual form. In the case of one very modern, innovative design for a pedestrian/cycle bridge, laser scanning helped keep the project on-time, on-budget and aided in turning the design into reality. By employing terrestrial LIDAR, material scrap rates were significantly reduced and project delays were kept to a minimum.

Implementing a Transportation Solution
The City of Pickering is a rapidly expanding suburban city of 90,000 people approximately 20 miles (32km) east of downtown Toronto, Ontario, Canada. Because the Toronto "region" is a sprawling metropolis of about 5 million people, large highways and mass transit are essential commutation conduits to and from the downtown core. Pickering sits just on the north shore of Lake Ontario and is bisected by Highway 401 (the busiest highway in Canada and one of the busiest in all of North America), as well as major passenger and freight rail lines.

In 2011, with funding from multiple levels of government and the provincial rail agency, Metrolinx, a bridge project was undertaken to provide pedestrians, cyclists and commuters with the ability to easily traverse these major east-west transportation corridors in a comfortable and, some might say, stylish fashion. (See Figure 1 for an example of the artistic nature of the design.) At over $20million (CDN) the span is intended to help connect the City of Pickering to the major transportation systems in Southern Ontario, and is eyed as an impetus to help transform the downtown area of the city by creating pedestrian access across the transportation corridor. Additionally, the bridge is designed to allow easy access to the commuter rail station/platforms, parking lots and shopping centers that are adjoining the highway and rail lines.

Modern Design and construction Methods
AECOM Canada is responsible for the overall design and construction of the two-phase project, with Teeple Architects providing the preliminary design and APlus General Contractor acting as the lead construction firm. AECOM used Revit Building Information Modeling (BIM) software to model the complex design and employed Integrated Project Delivery (IPD) techniques for construction. BIM-dependent IPD aids in the communication with the sub-contractors/sub-trades to estimate material delivery quantities and to provide a method for feedback on design. IPD helps smooth the "hand-off" points between the trades as well.

Generally, BIM’s are leveraged throughout the design-build and even extend into the full life-cycle of the construction project continuing on as a "facilities management tool" extending into operations and maintenance aspects of the facility after completion of construction. The BIM can sometimes be used as an accurate as-built document, especially when scan data is available to compare to design and then used to update the model layers. While using BIM-based IPD makes the handoff between sub-trades much easier and minimizes confusion, sometimes there are complexities in the design where adjustment is required to meet the requirements during construction. Using a LIDAR scanner can aid in determining if there are slight discrepancies between the design model and the actual as-built conditions. This is especially helpful where tight tolerances are concerned.

A Unique Design
The fully accessible and completely enclosed Pickering Bridge is the first of its kind in Canada. It stretches over 800 feet (about 240meters). A standard truss-based steel structure with concrete flooring and membrane-on-steel-deck roof, the bridge’s interior has customized glazing that provides a comfortable interior environment. It is also the first pedestrian bridge to be covered in highly specialized perforated aluminum sheeting (cladding) called Kalzip.

Utilizing a passive ventilation approach, the Kalzip material resists solar gain, easily sheds snow/ice (before accumulating), reduces wind-loading, and due to the perforations, serves as a transmissive material for light and air. In addressing the unique construction challenges of the glazing within the structure and also the compound curves required in the design of the Kalzip cladding, it fell to the use of terrestrial LIDAR to assist in providing project cost and time savings by verifying the as-built situation for two different aspects of the construction.

Continue reading the full article on LiDARnews

A 3.643Mb PDF of this article as it appeared in the magazine—complete with images—is available by clicking HERE

Filed Under: Articles from Spatial Media Authors, LiDAR, SPATIAL MEDIA AUTHORS Tagged With: Articles, Articles from Spatial Media Authors, Scan Twice—Cut Once: Accelerating Project Completion (Within Budget) Using LIDAR

Editor’s Picks

Learn to Make Decisions Using Lidar Data and Geographic Information Systems

Data Tip – Customized Coverage from LandScan Global Population Database

World LiDAR Market is Expected to Reach $921.2 Million by 2022 – Allied Market Research

CoreLogic Data Reveals Wildfires Pose Big Risk to Nearly 900,000 Western US Homes in 2015

See More Editor's Picks...

About Editor

Glenn is a geographer and a GIS professional with over 20 years experience in the industry. He's the co-founder of GISuser and several other technology web publications.

Recent Industry News

The Drift Between Early Notes and Final Case Files in Abuse-Related Legal Support

April 29, 2026 By GISuser

Aerial Surveys Int’l and Global Marketing Insights to Present GEOINT 2026 Workshop on Multi-Domain Geospatial Fusion for Automated Infrastructure Monitoring

April 24, 2026 By GISuser

Why Timing Matters More Than You Think With Spray Seal (And Why People Often Get It Slightly Wrong)

April 22, 2026 By GISuser

The Quiet Planning Stage Most People Don’t See When Building a Pool in Brisbane

April 22, 2026 By GISuser

Hot News

State of Data Science Report – AI and Open Source at Work

HERE and AWS Collaborate on New HERE AI Mapping Solutions

Virtual Surveyor Adds Productivity Tools to Mid-Level Smart Drone Surveying Software Plan

Categories

Copyright gletham Communications 2015 - 2026

Go to mobile version