GIS user technology news

News, Business, AI, Technology, IOS, Android, Google, Mobile, GIS, Crypto Currency, Economics

  • Advertising & Sponsored Posts
    • Advertising & Sponsored Posts
    • Submit Press
  • PRESS
    • Submit PR
    • Top Press
    • Business
    • Software
    • Hardware
    • UAV News
    • Mobile Technology
  • FEATURES
    • Around the Web
    • Social Media Features
    • EXPERTS & Guests
    • Tips
    • Infographics
  • Blog
  • Events
  • Shop
  • Tradepubs
  • CAREERS
You are here: Home / * PRESS / Business / Statoil signs new multiyear agreement with AVEVA for AVEVA Everything3D

Statoil signs new multiyear agreement with AVEVA for AVEVA Everything3D

January 19, 2016 By GISuser

AVEVA’s flagship, multi-discipline, 3D plant design solution defines a new strategy for Statoil

Cambridge, UK – 19 January 2016: AVEVA today announced that it has entered a multiyear agreement with Statoil ASA for AVEVA Everything3D™ (AVEVA E3D™). The Norwegian Energy owner operator has selected AVEVA E3D to be its strategic 3D design software platform.

Following the migration to AVEVA E3D by a number of other companies, Statoil selected it as the natural upgrade of its existing design system, AVEVA PDMS™. Statoil will benefit from improved design efficiency and AVEVA E3D’s simple migration from AVEVA PDMS, means there will be no disruption to existing projects. This will give Statoil and its contractors the possibility of cutting project schedules and reducing rework during both the design and construction phase.

Statoil has been a strategic user of AVEVA PDMS and AVEVA Global™ for more than 15 years and acknowledges the value this software has brought when executing field development, maintenance and modification projects as well as during the operation and revamp of its portfolio of facilities.

Moving forward AVEVA E3D will give Statoil the possibility to meet the future demand of cost effective project execution, utilising its integration with high-definition laser survey capabilities, comprehensive clash detection and improved design and drawing capabilities. As existing users of AVEVA PDMS, it’s compatibility with AVEVA E3D, ensured that Statoil can migrate and access the 3D design for both new and existing facilities in a flexible and controlled manner.

‘Statoil has selected AVEVA E3D as its 3D solution of choice for both its greenfield and brownfield complex plant design projects’, said Helmut Schuller, Executive Vice President – Sales, AVEVA. ‘AVEVA’s unmatched design efficiency in brownfield is due to AVEVA E3D’s extremely tight integration with laser scanning capabilities, and its simple migration from AVEVA PDMS. The AVEVA E3D interface is very easy to use and extremely powerful so our customers are up-to-speed quickly with minimal training and no disruption to existing projects. Its ease of implementation and use gives Statoil access to AVEVA E3D’s multitude of benefits without the normal risks associated with new projects and long-term operations.’

Statoil is currently using AVEVA software on 52 Brownfield and 7 Greenfield models plus the new Johan Sverdrup field development project that today consists of 7 models. Older plants such as Snøhvit LNG Plant in the Barents Sea, the refinery at Mongstad in Norway and Kalundborg in Denmark, and the gas treatment facility at Kårstø have been converted to AVEVA PDMS. Statoil’s new strategy to standardise on AVEVA E3D offers the potential for significant project efficiencies in the design, operation and revamp of all Statoil facilities in the future.

About AVEVA

For almost 50 years, AVEVA software has enabled the creation of some of the world’s most complex power and process plants, vessels and offshore facilities. AVEVA’s Digital Asset approach ensures there is always an accurate digital representation of each physical asset. This allows engineering contractors, Owner Operators and shipbuilders to work more safely, more efficiently and with less risk throughout the life cycle of their projects and operations. AVEVA is the proud winner of the Frost and Sullivan 2015 Global Engineering Information Management Solutions Competitive Strategy Innovation and Leadership Award. For further information please visit www.aveva.com/ednotes.

  • Follow AVEVA on twitter @avevagroup
  • Watch AVEVA on YouTube www.youtube.com/avevagroup
  • For customer stories read AVEVA World Magazine at www.aveva.com/Media-Centre/AWM


 

Filed Under: Business Tagged With: 3D, AVEVA

Editor’s Picks

HP Inc. Combines Power and Style as it Unleashes World’s First Quad Core Workstation Ultrabook

Join Esri, IBM, Amazon at the AT&T Mobile App Hackathon – Los Angeles

Infographic – What’s New in iOS 8?

ArcGIS 10.3 and ArcGIS Pro Now Available – Modernize GIS for Organizations and Enterprises

See More Editor's Picks...

Recent Industry News

The Future of Competitive Gaming: Why DMA Technology is the Ultimate Performance Edge

June 24, 2026 By GISuser

Milwaukee M18FHZ-0 Hackzall Reciprocating Saw – For hardcore cutting in a compact size

June 19, 2026 By GISuser

How Enterprises Are Using AI to Automate 80% of Customer Interactions With Voice Agents

June 16, 2026 By GISuser

Why On Cloud Shoes Are Worth the Price in Mexico

June 16, 2026 By GISuser

Hot News

State of Data Science Report – AI and Open Source at Work

HERE and AWS Collaborate on New HERE AI Mapping Solutions

Virtual Surveyor Adds Productivity Tools to Mid-Level Smart Drone Surveying Software Plan

Categories

Copyright gletham Communications 2015 - 2026

Go to mobile version