GIS user technology news

News, Business, AI, Technology, IOS, Android, Google, Mobile, GIS, Crypto Currency, Economics

  • Advertising & Sponsored Posts
    • Advertising & Sponsored Posts
    • Submit Press
  • PRESS
    • Submit PR
    • Top Press
    • Business
    • Software
    • Hardware
    • UAV News
    • Mobile Technology
  • FEATURES
    • Around the Web
    • Social Media Features
    • EXPERTS & Guests
    • Tips
    • Infographics
  • Blog
  • Events
  • Shop
  • Tradepubs
  • CAREERS
You are here: Home / News / GPS / Status Of Testing In Connection With Lightsquared’s Request For ATC Commercial Operating Authority

Status Of Testing In Connection With Lightsquared’s Request For ATC Commercial Operating Authority

September 15, 2011 By Editor

FCC Public Notice – IB Docket No. 11-109 

This Public Notice is issued pursuant to the provision of LightSquared Subsidiary LLC’s (LightSquared) conditional Ancillary Terrestrial Component (ATC) authorization that LightSquared may not commence ATC operations until the Commission, in consultation with the National Telecommunications and Information Administration (NTIA), finds that Global Positioning System (GPS) interference concerns have been satisfactorily resolved. Following extensive comments received as a result of the technical working group process required by the International Bureau’s Order and Authorization dated January 26, 2011,1 the Federal Communications Commission, in consultation with NTIA, has determined that additional targeted testing is needed to ensure that any potential commercial terrestrial services offered by LightSquared will not cause harmful interference to GPS operations.2

As a result of concerns raised by NTIA (on behalf of military and civilian federal agencies) and the GPS industry, the Commission conditioned the January 26, 2011 Order and Authorization on LightSquared sufficiently addressing the potential for harmful interference that its planned commercial terrestrial service could cause to GPS devices, including those used to protect national security and public safety. The conditional authorization required LightSquared to help organize and to fully participate in a technical working group to bring together LightSquared and the GPS community to address potential interference to GPS from LightSquared’s ATC operations. For more than three months, the technical working group, comprised of more than 120 participants including representatives from the Department of Defense, Department of Transportation and other federal agencies, the GPS community, various telecommunications companies and LightSquared, conducted an extensive set of tests, and LightSquared submitted a final report on June 30, 2011. The technical working group effort identified potential for harmful interference from LightSquared’s originally proposed deployment based on operation of terrestrial transmitters in both the upper and lower 10 MHz portions of its spectrum. The FCC issued a public notice on June 30, 2011, seeking comment on the report.3

LightSquared submitted proposed mitigation techniques to remedy the interference to GPS simultaneously with the technical working group final report. 4 Notably, LightSquared proposed to revise its planned deployment to operate terrestrial transmitters only in the lower 10 MHz of its spectrum. The results thus far from the testing using the lower 10 MHz showed significant improvement compared to tests of the upper 10 MHz, although there continue to be interference concerns, e.g., with certain types of high precision GPS receivers, including devices used in national security and aviation applications. Additional tests are therefore necessary.

We appreciate the extensive resources devoted by all of the participants in the technical working group and by the federal agencies and departments. We are satisfied that the process that was established through the conditional authorization, as well as the consultation process that exists between the FCC and NTIA, is meeting our objective to fully understand the potential for harmful interference and develop solutions before LightSquared is permitted to deploy service. We strongly encourage all parties to work in good faith and expeditiously towards a solution that serves our dual goals of facilitating the introduction of new wireless broadband services while protecting GPS against harmful interference. 

www.fcc.gov

By the Chiefs, International Bureau & Office of Engineering and Technology

1 26 FCC Rcd 566 (Int’l Bur. 2011).

2 We note that NTIA has been active in consultations with key federal agencies potentially impacted by LightSquared’s proposed operations, as well as LightSquared itself. See NTIA’s Assistant Secretary Larry E. Strickling’s letter to Deputy Secretary of Defense William Lynn and Deputy Secretary of Transportation John Porcari of September 9, 2011. http://fjallfoss.fcc.gov/ecfs/document/view?id=7021708329.

See Also:

1. Protect GPS Rally – A Public Demonstration in Support of High precision GPS, Seattle WA
(News/GPS)
… ISSUE: High precision GPS could be substantially damaged by interference if the FCC approves the proposed LightSquared transmission plan – FCC FileNo. SAT-MOD-20101118-00239 MESSAGE: Do n…
14 September 2011

2. LightSquared and Advanta Technologies Announce Long-Term 4G-LTE Wholesale Agreement
(News/Business)
RESTON, VA and HOUSTON, TX, September 6, 2011 – LightSquared™, the nation’s first wholesale-only integrated 4G-LTE wireless broadband and satellite network, and Advanta Technologies, a Texas
06 September 2011

3. GPS Industry’ s Failure to Comply With DOD and International Standards for GPS Receivers
(News/GPS)
From LightSquared: GPS Industry’ s Failure to Comply With Department of Defense and International Standards for GPS Receivers Cause of Interference RESTON, Va., August 11, 2011 – The GPS i
12 August 2011

4. Mobile Internet and Location Based Services Drive Demand for Spirent Wireless Testing Solutions
(News/Mobile Mapping, Field GIS, LBS)
…;   Served as an expert advisor to the massive industry-wide test effort aimed at determining whether LightSquared’s new terrestrial LTE network proposed for the US is likely to cause unacce…
11 August 2011

5. Esriuc Feature / Video – Survey Summit, A Solution for LightSquared?
(News/International ESRI User Conference)
From Marc Cheves in the latest edition of the American Surveyor Today Newsletter… LightSquared was the biggest item on the agenda, and after two separate sessions, both sides of the issue agreed th
20 July 2011

6. From esriuc – LightSquared Sessions at Survey Summit: A Possible Solution?
(News/International ESRI User Conference)
…recently held esriuc Survey Summit and ACSM event in San Diego a special forum was held to address the topic of Lightsquared. The American Surveyor Magazine Managing editor Marc Cheves offered up some…
18 July 2011

Filed Under: GPS Tagged With: GPS, News, Status Of Testing In Connection With Lightsquared's Request For ATC Commercial Operating Authority

About Editor

Glenn is a geographer and a GIS professional with over 20 years experience in the industry. He's the co-founder of GISuser and several other technology web publications.

Top Press

The Global Expansion of Aueshah: A New Era of High Jewelry

April 11, 2026 By GISuser

KARACHI, PAKISTAN. The international luxury market is experiencing a profound shift. Consumers are increasingly rejecting mass-produced goods in favor of rarity, authenticity, and emotional depth. … [Read More...]

State of Data Science Report – AI and Open Source at Work

September 10, 2025 By GISuser

AI and Open Source at Work … [Read More...]

Topcon Announces Landmark Expansion of Topnet Live Network Across USA

January 26, 2025 By GISuser

LIVERMORE, Calif.---Topcon Positioning Systems has announced a significant expansion of its Topnet Live reference station network, introducing 200 new geodetic stations strategically positioned across … [Read More...]

Space Flight Laboratory (SFL) Announces Launch and Deployment of NorSat-4 Maritime Monitoring Microsatellite

January 19, 2025 By GISuser

Seventh Satellite Developed by SFL for Norway … [Read More...]

HERE and BMW Group extend partnership on AI-powered mapping system

January 8, 2025 By GISuser

HERE and BMW Group extend partnership on AI-powered mapping system for automated driving and enhanced road safety … [Read More...]

Everest Base Camp Helicopter Tour, Helicopter Return Trek, and Manaslu Circuit Trek: Which Nepal Adventure Is Right for You?

November 6, 2026 By GISuser

Almost everyone planning a Nepal trip runs into the same wall. You want the big mountains, you have a fixed number of days, and every itinerary you read seems to promise something … [Read More...]

SFL Missions Inc. Confirms Successful Deployment of Six HawkEye 360 Radio Frequency Detection Satellites with Advanced Capabilities

October 27, 2026 By GISuser

MĀHIA, New Zealand, 26 October 2026 – SFL Missions Inc. today confirmed the successful deployment of six radio frequency (RF) detection and geolocation satellites for HawkEye 360 … [Read More...]

Canadian-Built RoadEng 12 Uses AI to Find the Best Location for New Resource and Rural Roads

October 17, 2026 By GISuser

Vancouver, BC, Canada, October 15, 2026 – North Vancouver-based Softree Technical Systems today released RoadEng Version 12, used in more than 75 countries to locate and design … [Read More...]

Beyond the Map: How AI Image and Video Generation Is Changing Geospatial Communication

October 14, 2026 By GISuser

Ask anyone who has shipped a GIS project what the hardest part was, and the answer is rarely the spatial analysis. It is almost always the communication. A site suitability … [Read More...]

From Maternity to Everyday Wear: Building a Wardrobe That Grows With You

October 14, 2026 By GISuser

When I think about maternity clothing, I feel the biggest mistake is buying too many things at once. During pregnancy, your body keeps changing, and something that fits well today … [Read More...]

Copyright gletham Communications 2015 - 2026

Go to mobile version