GIS user technology news

News, Business, AI, Technology, IOS, Android, Google, Mobile, GIS, Crypto Currency, Economics

  • Advertising & Sponsored Posts
    • Advertising & Sponsored Posts
    • Submit Press
  • PRESS
    • Submit PR
    • Top Press
    • Business
    • Software
    • Hardware
    • UAV News
    • Mobile Technology
  • FEATURES
    • Around the Web
    • Social Media Features
    • EXPERTS & Guests
    • Tips
    • Infographics
  • Blog
  • Events
  • Shop
  • Tradepubs
  • CAREERS
You are here: Home / * PRESS / Business / Satellite building on an entirely new scale

Satellite building on an entirely new scale

February 25, 2019 By GISuser

Airbus Friedrichshafen triples the size of its integration facilities – Europe’s most state-of-the-art satellite and space technology centre begins operation

Friedrichshafen, 22 February 2019 – Airbus’ Friedrichshafen site has opened Europe’s most state-of-the-art satellite integration and space technology centre, known as the Integrated Technology Centre (ITC). The ITC, which triples the area of clean room space to 4,200 m2, is dedicated to building satellites, probes, space instruments and experimental technologies. The centre took only two years to build at a total cost of approximately €45 million.

“Airbus’s significant investment in this building also represents an investment in the future – both for the Airbus site at Lake Constance and for Baden-Wuerttemberg as an aerospace location. When it comes to space technology, we are now a step ahead of the rest of Germany – in terms of science and research, development and technology, and enthusiasm for the aerospace industry,” said Baden-Wuerttemberg’s Minister-President, Winfried Kretschmann. “With this technology centre, Airbus has shown it has the courage to take the leap into a new age of even better satellites, and this includes those intended for scientific purposes. Satellites can, for instance, document changes in sea levels and detect even small sources of greenhouse gas emissions. Satellites of this nature are helping to expand the basic scientific knowledge needed to combat climate change.”

“Space flight has undergone huge positive development over the past few years. In addition to scientific missions to explore our solar system and investigate fundamental physical laws, we as a space company are meeting a swiftly increasing demand for high-performance, ultra-reliable Earth observation, meteorological and navigation satellites,” said Nicolas Chamussy, Head of Airbus Space Systems. “Thanks to the new satellite hub, production at Airbus’s Friedrichshafen site is optimally positioned in terms of both quality and quantity compared with our competitors.”

With dimensions of 70 x 60 metres and a ceiling height of up to 18.50 metres, the building was designed to expand the current satellite integration hall. The new ‘dual’ complex enables projects to be executed more efficiently and economically and, thanks to cutting-edge technology and its new size, also offers new possibilities for developing future space projects, such as large space telescopes.

The centrepiece of the ITC is its large clean room. The final integration of the satellites takes place under clean room conditions of various ‘cleanliness classes’ (from ISO 8 to ISO 5) in facilities totalling approximately 2,100 m2, of which 400 m2 are dedicated to ISO 5. Extensive air conditioning and filter systems circulate an air volume of 900,000 m3 up to 60 times an hour, which not only ensures the required levels of cleanliness but also a consistently elevated air pressure, in addition to controlling humidity and temperature.

Four seismic blocks, each weighing 150 tonnes, ‘decouple’ special integration tables from the building and ensure a completely vibration-free environment for the installation of optical instruments. A computer-controlled fan and filter matrix on the south side of the clean room generates air-flow profiles that can be adjusted to the occupancy of the room. This concept allows different clean room classes to be created in a single hall with no disruptive partitions or curtains.

In the adjacent check-out rooms, technicians can conduct a broad array of electrical function tests without having to enter the clean room area. All computer systems are housed in their own air-conditioned, noise-insulated racks.

The two wings of the ITC provide a further 1,100 m2 of integration and laboratory space for component manufacturing and technical areas. The first floor of the building’s west wing houses a conference zone and a multifunctional showroom and information space, whose large panoramic windows provide a unique view of the flight hardware production process.

Four Sentinel satellites for the European environment and security programme ‘Copernicus’, the joint European-Japanese EarthCARE Earth observation satellites and two 12.30-metre-long planar radar antennas are the first projects to move into the new centre. The integration work for JUICE, a mission to the icy moons of Jupiter (set to launch in 2022), is also expected to start within the next six months.

 

Filed Under: Business Tagged With: Airbus

Top Press

The Global Expansion of Aueshah: A New Era of High Jewelry

April 11, 2026 By GISuser

KARACHI, PAKISTAN. The international luxury market is experiencing a profound shift. Consumers are increasingly rejecting mass-produced goods in favor of rarity, authenticity, and emotional depth. … [Read More...]

State of Data Science Report – AI and Open Source at Work

September 10, 2025 By GISuser

AI and Open Source at Work … [Read More...]

Topcon Announces Landmark Expansion of Topnet Live Network Across USA

January 26, 2025 By GISuser

LIVERMORE, Calif.---Topcon Positioning Systems has announced a significant expansion of its Topnet Live reference station network, introducing 200 new geodetic stations strategically positioned across … [Read More...]

Space Flight Laboratory (SFL) Announces Launch and Deployment of NorSat-4 Maritime Monitoring Microsatellite

January 19, 2025 By GISuser

Seventh Satellite Developed by SFL for Norway … [Read More...]

HERE and BMW Group extend partnership on AI-powered mapping system

January 8, 2025 By GISuser

HERE and BMW Group extend partnership on AI-powered mapping system for automated driving and enhanced road safety … [Read More...]

Everest Base Camp Helicopter Tour, Helicopter Return Trek, and Manaslu Circuit Trek: Which Nepal Adventure Is Right for You?

November 6, 2026 By GISuser

Almost everyone planning a Nepal trip runs into the same wall. You want the big mountains, you have a fixed number of days, and every itinerary you read seems to promise something … [Read More...]

SFL Missions Inc. Confirms Successful Deployment of Six HawkEye 360 Radio Frequency Detection Satellites with Advanced Capabilities

October 27, 2026 By GISuser

MĀHIA, New Zealand, 26 October 2026 – SFL Missions Inc. today confirmed the successful deployment of six radio frequency (RF) detection and geolocation satellites for HawkEye 360 … [Read More...]

Canadian-Built RoadEng 12 Uses AI to Find the Best Location for New Resource and Rural Roads

October 17, 2026 By GISuser

Vancouver, BC, Canada, October 15, 2026 – North Vancouver-based Softree Technical Systems today released RoadEng Version 12, used in more than 75 countries to locate and design … [Read More...]

Beyond the Map: How AI Image and Video Generation Is Changing Geospatial Communication

October 14, 2026 By GISuser

Ask anyone who has shipped a GIS project what the hardest part was, and the answer is rarely the spatial analysis. It is almost always the communication. A site suitability … [Read More...]

From Maternity to Everyday Wear: Building a Wardrobe That Grows With You

October 14, 2026 By GISuser

When I think about maternity clothing, I feel the biggest mistake is buying too many things at once. During pregnancy, your body keeps changing, and something that fits well today … [Read More...]

Copyright gletham Communications 2015 - 2026

Go to mobile version