GIS user technology news

News, Business, AI, Technology, IOS, Android, Google, Mobile, GIS, Crypto Currency, Economics

  • Advertising & Sponsored Posts
    • Advertising & Sponsored Posts
    • Submit Press
  • PRESS
    • Submit PR
    • Top Press
    • Business
    • Software
    • Hardware
    • UAV News
    • Mobile Technology
  • FEATURES
    • Around the Web
    • Social Media Features
    • EXPERTS & Guests
    • Tips
    • Infographics
  • Blog
  • Events
  • Shop
  • Tradepubs
  • CAREERS
You are here: Home / environment / Landsat 8, officially began its mission on May 30, 2013

Landsat 8, officially began its mission on May 30, 2013

June 13, 2013 By Editor

The latest in the Landsat series of Earth observation satellites, Landsat 8, officially began its mission on May 30. The purpose is to extend an unparalleled four-decade record of Earth’s land surface as seen from space.  NASA launched the Landsat Data Continuity Mission satellite on February 11. Since then, NASA mission engineers and scientists, with USGS collaboration, have been putting the satellite through its paces – steering it into its orbit, focusing the instruments, calibrating the detectors, and collecting test images. Now fully mission-certified, the satellite will be transferred to USGS operational control and renamed  Landsat 8. The specs:

The technical capabilities of Landsat 8 move forward in three areas in comparison to Landsat 7:  increased spectral coverage; higher data precision (the ultimate resolution is not changed); and increased quantity of data collection (60% more scenes per day).

Landsat 8 will orbit Earth once every 99 minutes at an average altitude of 438 miles (705 kilometers),  repeating the same ground track every 16 days.  As Landsat 8 joins Landsat 7 in imaging the Earth, researchers and natural resource managers will once again be able to receive Landsat data every eight days for any given location. Many Landsat users depend on a short repeat cycle for prompt data on resources such as agricultural crops, forests, and water.  The USGS, NASA, and aerospace contractors have worked diligently to ensure that Landsat 8 would be operational in time for the 2013 North American growing season.

The Landsat program is a joint effort between the U.S. Geological Survey and NASA.  Read more HERE

Source: gisuser.com via Glenn on Pinterest

Filed Under: environment, Landsat, nasa, satellite imagery, usgs

Editor’s Picks

LizardTech White Paper Reveals 12 Hidden Gems in GeoExpress Software

NASA, NOAA Find 2014 Warmest Year in Modern Record

Data Tip – Customized Coverage from LandScan Global Population Database

Arkansas.gov Ranks Among Top 3 Government Websites

See More Editor's Picks...

About Editor

Glenn is a geographer and a GIS professional with over 20 years experience in the industry. He's the co-founder of GISuser and several other technology web publications.

Recent Industry News

Furnace Repair: Fast Fixes for a Warm, Worry-Free Home

September 15, 2026 By GISuser

Aerial Surveys International Awarded GSA Multiple Award Schedule Contract

September 12, 2026 By GISuser

New Episode Alert: The Colorado State University (CSU) Drone Center

September 10, 2026 By GISuser

Increase Rev vs. Google AdSense: Unlocking 50%–200% Higher Earnings

August 17, 2026 By GISuser

Hot News

State of Data Science Report – AI and Open Source at Work

HERE and AWS Collaborate on New HERE AI Mapping Solutions

Virtual Surveyor Adds Productivity Tools to Mid-Level Smart Drone Surveying Software Plan

Categories

Copyright gletham Communications 2015 - 2026

Go to mobile version